QuickSigner›Contract templates›PRD template
A free product requirements document in 14 short sections: the problem, the goals and metrics, what is out of scope, the requirements, the release plan and a sign-off page.
No account, no email address. Free to download and edit. See all 4 pages
4 pages · PDF and WordA product requirements document (PRD) describes what a product or feature must do, who it is for, why it matters and how success will be measured, so that product, design and engineering work from the same page.
It states the problem and the requirements. It does not prescribe the technical solution, which belongs in a design or engineering document.
| PRD | Technical design document | |
|---|---|---|
| Question it answers | What are we building, for whom and why? | How will we build it? |
| Written by | The product owner. | Engineering. |
| Contents | Problem, goals, metrics, users, requirements, release plan. | Architecture, data model, interfaces, trade-offs. |
| Approved by | Product, engineering and design leads. | The engineering team and its reviewers. |
Use it when several people must agree on what a release includes before work starts.
A team needs one agreed scope.
Another document fits better.
Fourteen sections on four pages. The table says what each section is for and what you write in it.
| Section | What it does | What you fill in |
|---|---|---|
| 1. Document control | Identifies the document and its status. | Name, owner, version and date, status, target release |
| 2. Problem statement | The user or business problem, with evidence such as support tickets, churn data or user quotes. | One or two paragraphs |
| 3. Goals and success metrics | What success looks like in numbers that you will measure after launch. | Two or three metrics, each with a baseline and a target |
| 4. Non-goals | What this release deliberately will not do. | A short list |
| 5. Target users | The primary persona and their context. | One persona, described precisely |
| 6. User stories and use cases | What the user wants to do and why, starting with the main path. | Stories in the form “As a…, I want to…, so that…” |
| 7. Functional requirements | A numbered table of what the system must do, with a priority and a status for each. | One row per requirement, FR-1 to FR-8 and beyond |
| 8. Non-functional requirements | Performance, security, privacy, accessibility, localization, compliance and supported platforms. | Targets and constraints |
| 9. Design and UX | Points to the mockups or prototype and names the design owner. | Links and owner |
| 10. Dependencies and assumptions | Other teams, third-party services, data migrations and legal reviews the work depends on. | A short list |
| 11. Risks and mitigations | A table of risks with their impact and the mitigation or owner. | One row per risk |
| 12. Release plan and milestones | Phases, rollout and launch dates, with an owner for each milestone. | One row per milestone |
| 13. Open questions | Unresolved decisions, each with an owner and a due date. | A short list |
| 14. Approvals and sign-off | Signature blocks for the product owner, the engineering lead and the design lead. Signing means agreeing to the scope and the metrics. | Signature, name and date for each approver |
These are the pages of the file itself, in order. The Word version has the same text and is fully editable.
Free to download. No account and no email address needed.
Start with the problem, not the solution. Then fill in the template in this order.
Sample entries for a team adding saved payment methods to an online store checkout.
| Blank | Where | Example entry |
|---|---|---|
| Product / feature name | Section 1 | Saved payment methods at checkout, version 1.0, in review |
| Problem statement | Section 2 | Returning customers re-enter card details on every order. 14% of support tickets in Q4 mention checkout friction. |
| Success metric | Section 3 | Checkout completion rate for returning customers: baseline 61%, target 68% |
| Non-goal | Section 4 | No new payment providers in this release |
| Target user | Section 5 | A returning customer ordering on a phone |
| User story | Section 6 | As a returning customer, I want to pay with a saved card, so that I can order in under a minute |
| Functional requirement | Section 7 | FR-1: The system shall let a signed-in customer save a card after a successful payment. Priority: Must |
| Non-functional requirement | Section 8 | Card data is stored only by the payment provider, never on our servers |
| Milestone | Section 12 | Release to 10% of customers on March 15, 2027; owner: engineering lead |
These entries are an illustration. Adapt the sections and the level of detail to your team.
Each one has a fix built into the template.
A PRD that opens with a feature skips the question of whether it solves anything.
Write the problem statement first, with evidence (section 2).
A goal without a baseline and a target cannot show whether the release worked.
Pick two or three metrics you will actually track (section 3).
Without them, scope grows during the build.
List what the release will not do (section 4).
Engineering, QA and support cannot refer to an unnumbered requirement.
Give every requirement an ID and a priority (section 7).
A question that belongs to nobody stays open.
Give each one an owner and a due date (section 13).
The signed document then no longer matches what is being built.
Record the change in section 13, raise the version and collect approval again.
A PRD is an internal planning document, not a contract. Three points to keep in mind. This is general information, not legal advice.
A PRD records what a team has agreed to build. It creates no obligation toward a customer or a supplier.
If an outside vendor will do the work, put the scope, the deliverables and the acceptance criteria in a signed statement of work.
Section 14 defines what a signature means: the approver has read the document, agrees with the scope and the metrics, and commits their team to the plan. A dated signature shows who approved which version, which is useful when scope is questioned later.
Under the federal ESIGN Act, a contract may not be denied legal effect solely because an electronic signature was used to form it (15 U.S.C. § 7001). At state level, the Uniform Electronic Transactions Act has been adopted by 49 states and the District of Columbia, and New York has a similar statute of its own. Approvals collected electronically are therefore valid.
Privacy, security and accessibility requirements in section 8 can come from laws or from contracts with customers, not only from product choices. List any legal review among the dependencies in section 10, and have the reviewer sign off as an additional approver.
Save the completed document as a PDF, upload it and add the signers. The three steps are shown in the real QuickSigner app (Professional plan), with a sample service agreement.
Upload the completed PDF, add the person who signs for each party, and place a signature field in each signature block. Then press Send.

Each signer opens the link and goes straight to the document, on a phone or a computer. They draw, type or upload a signature and finish in one tap.

When the last signature lands, download the signed document as a sealed PDF, with its completion certificate and event log.

A PRD, or product requirements document, describes what a product or feature must do, who it is for, why it matters and how success will be measured. It gives product, design and engineering one agreed description of the work.
The problem, the goals and success metrics, the non-goals, the target users, user stories, functional and non-functional requirements, design links, dependencies, risks, a release plan, open questions and approvals. This template has a section for each.
Usually the product manager or product owner, with input from engineering, design and the teams that deal with customers. The leads of those teams review it and sign it in section 14.
As short as it can be while still answering what, for whom and why. This template is four pages. Link to mockups and research instead of copying them into the document.
A market requirements document describes the market opportunity and customer needs. A PRD turns those needs into the requirements for one product or release. Some teams combine both in a single document.
Functional requirements say what the system must do, such as “save a card after payment”. Non-functional requirements say how well it must do it: performance, security, privacy, accessibility and supported platforms. The template has a section for each kind.
It is a way to set priorities: Must have, Should have, Could have and Won’t have in this release. The functional requirements table in section 7 has a priority column for it.
Many do, in a shorter form. A brief PRD sets the problem, the goals and the scope, and the detailed work is tracked as user stories in the backlog. The document is updated as decisions are made.
Yes. Under the federal ESIGN Act and the state UETA laws, a signature cannot be denied legal effect only because it is electronic. Upload the PRD to QuickSigner, place a signature field for each approver on page 4 and send it.
The template is free, and the PDF and Word files download without an account or an email address. You need a QuickSigner account only to send the document for electronic signature. The Free plan covers 5 documents a month, with no credit card.
No credit card. Each approver signs from a link, with no account and no app. Paid plans start with a 14-day free trial.